Client:
Galliford Try / Balfour Beatty (AWPR CJV)
Value/Contract:
+£500m on a bespoke form of contract

Aberdeen Bypass
Aberdeen Bypass
Large underground tunnel

Over a period of 3 years TWO PLUS TWO supported AWPR CJV on a variety of tasks including:

The valuation of the repair works relating to the damage caused by Storm Desmond to the then partially completed works; and

Reconciliation and valuation of the tender design and as-built design for 300km of drainage, the 72 principle structures and 100km of fencing and barriers.

Analysis and notification of changes and delays resulting from utilities diversionary works.

Sector:
Highways
Team:
Stew, Joe, Ross, Lee, Josh, Olivia, Ryan, Phil Stone, Katrina, Scott, Harry
Tasks:
Measurement, valuation, change identification and notification, dispute preparation, cost analysis, liaising with 3rd parties